| Client |
| | Baltimore District, U.S. Army Corps of Engineers |
|
| Description |
| | Renourishment of a 200-ft-wide beach over an 8.3-mile stretch of shoreline, followed by the construction of a hurricane protection bund complete with pedestrian crossovers and grass plantings to stabilize the dune system.
Dredging for Beachfill: 2.4 million yd³ by cutter suction and hopper dredge
Dredging for Dunes: 3.6 million yd³ by cutter suction and hopper dredge
Pumping Distances: Up to 43,000 ft |
|
| |