| Project |
| | San Diego Regional Sand Beach Project |
|
| Client |
| | San Diego Association of Governments
Engineers were Noble & Associates
Environmental monitoring was performed by AMEC |
|
| Contract |
|
| Description |
| | The project required the placement of approximately two million yd³ of sand dredged from six borrow areas at twelve discrete locations along 40 miles of coastline. The trailing suction hopper dredge Sugar Island was used.
|
|
| |
Associated Documents
|
| Nourishing San Diego Beaches |