HARBOR IMPROVEMENTS:  BERTHS 55 AND 56, OAKLAND
Project
 Dredge & Landfill, Berths 55 and 56, Port of Oakland
Client
 Port of Oakland
Role
 Subcontractor to General Construction Co.;
GLD&D performed all cutterhead dredging and reclation
Contract
 
Value: $5,000,000 (Private negotiation)
Duration: 3 months
Description
 
  • Mechanical dredging of a total of ~81,000 yd³ of shoaled
    material and bay mud
  • Stripping 540,000 yd³ from surface areas with land equipment
  • Cutterhead dredging 1.1 million yd³ of stiff material (N = > 30)Hydraulic fill: In two lifts, first to 10 ft, then to 30 ft
 