| Project |
| | Dredge & Landfill, Berths 55 and 56, Port of Oakland |
|
| Client |
|
| Role |
| | Subcontractor to General Construction Co.;
GLD&D performed all cutterhead dredging and reclation |
|
| Contract |
| | Value: $5,000,000 (Private negotiation)
Duration: 3 months |
|
| Description |
| |
-
Mechanical dredging of a total of ~81,000 yd³ of shoaled
material and bay mud
-
Stripping 540,000 yd³ from surface areas with land equipment
-
Cutterhead dredging 1.1 million yd³ of stiff material (N = > 30)Hydraulic fill: In two lifts, first to 10 ft, then to 30 ft
|
|
| |
Associated Documents
|
| Berths 55 and 56, Oakland |